Process & timeline
How long until I get the inspection report?
A standard commercial inspection report is delivered three to five business days after the site visit. A full ASTM E2018 Property Condition Assessment with cost tables takes five to ten business days, and rush delivery in 48 to 72 hours is available.
All FAQ / Process & timeline
Delivery windows
| Deliverable | Standard turnaround | Rush |
|---|---|---|
| Commercial condition report | 3 - 5 business days | 48 - 72 hours |
| ASTM E2018 Property Condition Assessment | 5 - 10 business days | 3 - 5 business days |
| Roof-only report | 2 - 3 business days | 24 - 48 hours |
| Phase I ESA (ASTM E1527) | 15 - 20 business days | 10 - 12 business days |
Why a PCA takes longer than a walk-through report
The site time is similar. The difference is analysis: remaining useful life determinations for each major system, opinions of probable cost for immediate repairs, and a capital reserve table projected across the lender's analysis period. That work happens after the walk, and it is what makes the report usable in underwriting rather than just informative.
What can delay a report
- Documents that arrive late - permit history, roof warranties, HVAC service records, prior environmental reports
- Tenant spaces that could not be accessed on inspection day and require a return visit
- A specialty consultant scope added mid-stream, such as a structural review or elevator certification
- Utility or agency records requests, which are outside our control
Getting information before the report
You do not have to wait for the PDF to make a decision. We provide a verbal summary at the end of the site visit and, on request, a short written list of material findings within 24 hours. Investment committees and lenders need the formal report, but a retrade conversation can start the day after the walk.
Format
Reports are delivered as a PDF with captioned photographs, findings tables you can export, and clear separation between immediate repairs and long-term capital items. If your lender requires a specific template or reliance letter, tell us at engagement and we will format accordingly.
Related questions
People also ask
How long does a commercial property inspection take?
Field time runs from about three hours on a small retail or office building to two full days on a large industrial or multifamily property. The written report follows in three to five business days, and rush delivery is available when a contingency deadline requires it.
What is included in a commercial property inspection?
A commercial property inspection covers the roof, structural system, building envelope, HVAC, electrical, plumbing, fire and life safety systems, vertical transportation, interiors, site improvements and accessibility observations, and delivers findings as prioritized immediate repair and capital reserve tables.
Can you meet a 10-day contingency deadline?
Yes for a condition assessment: we can often inspect within one to three business days and deliver a report in 48 to 72 hours. A full ASTM E1527 Phase I ESA cannot honestly be compressed into ten days, so the usual answer is a rush condition report plus a negotiated environmental extension.
What is an immediate repair versus a capital reserve item?
An immediate repair is a deficiency that requires action now or within roughly twelve months, usually for safety, code, or to prevent accelerating damage. A capital reserve item is a system nearing the end of its useful life whose replacement is projected across the analysis period, typically ten or twelve years.
Request a quote
Get this answered for your property
Send the address, asset type and approximate square footage. We reply with scope and fee, usually the same business day.
619-473-2133
Mon–Fri 7:00am–6:00pm
